Click here for the Agenda and the Entrance Road Presentation that they made at our March 7 meeting.
The PowerPoint presentation with the photos and conceptual drawings/overlays were prepared for the CAC meeting. We hope it provides the information to clarify what the view would look like. The most important slide is the last one, which shows the approximate grade based on the conceptual drawings. Part of the conceptual road cannot be seen, as it is below the freeway elevation or next to a hill, and part of the conceptual proposed road would be able to be seen.